Add a second rosin press when the existing unit remains suitable and reliable, another station can be supported, and your measured workload benefits from parallel equipment. Evaluate a larger replacement when one station, operator handling or the existing machine’s limitations make expansion impractical. Two presses do not automatically double output, and a larger force rating does not establish daily capacity.
This guide is for a buyer preparing an expansion or replacement proposal. It compares the layout of the investment, rather than recommending extraction settings. Confirm that the intended application is permitted and suitable for the exact equipment.
Identify the constraint before requesting two prices
Log where work waits: preparation, an occupied press, operator availability, inspection, cleaning or downstream handling. Also record maintenance interruptions and how much useful demand remains unmet. If a single operator is already fully occupied away from the machine, an extra station may add equipment without removing the queue.
Lowtemp’s purchasing guide discusses expanding through additional presses rather than simply increasing platen size. That is a useful alternative to evaluate, not proof that another supplier’s machines support the same arrangement or capacity.

Compare two complete proposals
| Decision factor | Retain the existing press and add a unit | Replace the existing press |
|---|---|---|
| Operator time | Measure handling and coordination across both stations; do not assume one person can safely attend both. | Verify whether the proposed unit actually reduces handling or simply accepts a different load. |
| Utilities | Assess simultaneous demand and any shared air or electrical supply. | Assess the replacement’s own requirements and any facility upgrades. |
| Downtime | One available machine may preserve some capability; shared services can still stop both. | Dependence is concentrated in one machine unless separate backup exists. |
| Space | Include two working envelopes, access and material movement. | Include the new envelope and removal/installation access. |
| Capacity evidence | Request evidence for the proposed arrangement and staffing. | Request evidence for the exact replacement configuration. |
| Purchase scope | Additional equipment, accessories, installation and maintenance. | New equipment, removal, installation and any accessory changes. |
Keep redundancy and throughput separate
Two independent machines may reduce exposure to one machine being unavailable. They do not provide complete redundancy if both rely on the same essential compressor, supply circuit or other bottleneck. Document the shared dependencies before assigning a business-continuity benefit.
For throughput, compare completed work under the same acceptance definition and staffing assumptions. A stated maximum load, platen area or force is not a shift-output figure. Ask who measured any claimed capacity, under which conditions, and what the figure excludes. Leave unsupported values blank.

Which EXTRACTPHYTO products can enter the comparison?
The press catalogue includes the CP3815-1 manual model and LCB1015-3 pneumatic model. These are distinct catalogue options; this article does not label either as the larger or higher-output choice for your existing installation.
Application restriction: both linked listings state that the machine is not suitable for children or for food processing. Do not select either for a food-processing project based on this comparison. Obtain model-specific confirmation of the intended application and installation requirements before purchase.

Approve the investment against demand, not theoretical capacity
Prepare two quotation briefs against the same business requirement. Separate quoted equipment and freight from your own labour, facility and downtime assumptions. An apparent saving from extra capacity only has value when you have demand and the supporting workflow to use it.
If the old press is unreliable, include its service history in the comparison. If demand is uncertain, state the uncertainty. A phased expansion can be evaluated without presenting estimated future output as an equipment guarantee.
Request a project-specific equipment comparison
EXTRACTPHYTO is a China-based manufacturer with the catalogue products linked above. Contact the team to establish whether those products match your purchasing brief; a catalogue listing is not confirmation of your application, stock, delivery date or commercial terms.
Send your current make/model and nameplate details, intended non-food application, measured bottleneck, staffing, workspace, available power/air, purchase quantity and destination; identify whether you want an additional station, a replacement, or both options quoted. If a specification or quantity is undecided, state what is known and ask for selection help. Include your company and a working reply email. Any sample, customization, minimum order, lead time, freight or warranty terms require written confirmation for the proposed order.
Email the equipment comparison brief or use the EXTRACTPHYTO contact page. Include this article URL so the team can understand which comparison prompted your enquiry.